Application

  • Zhangjiakou Olympic Corridor Project

    Location: Zhangjiakou, Hebei

    Scale:875MW(270MW has been connected to the grid)

    PV+barren mountain management, taking the 2022 Winter Olympics as the starting point.The total length of the project is 85 kilometers, benefiting tens of thousands of agricultural workers.


  • Wenzhou Letai Agriculture PV Complementary Project

    Location:  Wenzhou Oufei Phase I Enclosed Area

    Scale:150MW

    Product:CPS PSW3.125MW-1500V grid connected inverter

    Date of Operation:2020

  • Yueqing Agriculture and Fishery Complementary PV Project

    Location:Yueqing,Zhejiang 

    Scale:150MW

    Product: CPS SCA500KTL-H

  • Chint Group Wenzhou Taihan 550MW Fishery Complementary Project

    Location: Wenzhou Taihan

    Scale:Scale:550MW, covering an area of 5 km2

    Product:CPS 3.125MW inverter transformer turnkey, ASTRO 450Wp module

    Power generation: 650 million kWh/year

  • Jinchang Weisheng Phase II 25MW Photovoltaic Generation Project

    Location: Jinchang, Gansu

    Scale:25MW

    Product:CPS SCH250KTL-DO inverter, ASTRO 5-540Wp monocrystalline module

    Date of Operation: End of 2021

  • Fuxin 70MW Photovoltaic Power Generation Project

    Location: Fuxin, Liaoning

    Scale: 70MW

    Product: CPS SCH250KTL-DO / ASTRO 5-540Wp