275KW Utility PV Power Generation Project
Location: Romania
Scale:31MW
Product:275kW
-
Zhangjiakou Olympic Corridor Project
Location: Zhangjiakou, Hebei
Scale:875MW(270MW has been connected to the grid)
PV+barren mountain management, taking the 2022 Winter Olympics as the starting point.The total length of the project is 85 kilometers, benefiting tens of thousands of agricultural workers.
-
Wenzhou Letai Agriculture PV Complementary Project
Location: Wenzhou Oufei Phase I Enclosed Area
Scale:150MW
Product:CPS PSW3.125MW-1500V grid connected inverter
Date of Operation:2020
-
Yueqing Agriculture and Fishery Complementary PV Project
Location:Yueqing,Zhejiang
Scale:150MW
Product: CPS SCA500KTL-H
-
Chint Group Wenzhou Taihan 550MW Fishery Complementary Project
Location: Wenzhou Taihan
Scale:Scale:550MW, covering an area of 5 km2
Product:CPS 3.125MW inverter transformer turnkey, ASTRO 450Wp module
Power generation: 650 million kWh/year
-
Jinchang Weisheng Phase II 25MW Photovoltaic Generation Project
Location: Jinchang, Gansu
Scale:25MW
Product:CPS SCH250KTL-DO inverter, ASTRO 5-540Wp monocrystalline module
Date of Operation: End of 2021