Application

  • 2.2 MWh energy storage project in Gunma, Japan

    Project location: Gunma Prefecture, Japan

    Scale:2.2MWh

    Main equipment: CPS ES-125kW/268kWhCPS SCA50KTL-DO/JP

    Date of operation:: December 2020


  • Nagoya Plant Photovoltaic + Energy Storage System Project

    Project location: Japan · Nagoya
    Main equipment: CPS ES30kW/73.7kWh, CPS SCA50KTL-DO/JP
    Scale: 295kWh
    Grid-connected time: October 2019

  • Yokohama Laboratory Photovoltaic + Energy Storage System Project

    Project location: Yokohama, Japan
    Project scale: 73.7kWh
    Main equipment: CPS ES30kW/73.7kWh, CPS SCA50KTL-DO/JP
    Grid-connected time: September 2019
    Project value: peak shaving and valley filling, demand adjustment, backup power supply, and complementary solar storage.